Skip to main content

Solar

Enphase – Post Q123 takeaways

Written by

Beth Kindig

Founder, CEO and Lead Technology Analyst

Published: April 26, 2023

Last Updated: April 26, 2023

Enphase reported Q123 earnings on 4/25/23 after the market close. Enphase reported better than expected sales, gross margins and normalized eps.

Pro members

Sign in to read the full article

Sign in with your I/O Fund account to check your plan access.

Curation

Expand your knowledge

View all posts
AMD Stock: Two-Catalyst Punch Leads to 80% Growth Next Year
SEMICONDUCTOR STOCKS

AMD Stock: Two-Catalyst Punch Leads to 80% Growth Next Year

In August, our premium article "Venice Meets Helios" pointed to two strategic product releases that were arriving soon - AMD’s Venice CPUs and the highly anticipated Helios MI400 Series. At the time, management expected server CPU revenue to grow more than 70% in 2027, while total Data Center revenue would grow “well over 100%,” driven by the Helios ramp. Three months later, AMD has raised its outlook considerably, and the two product ramps are now exceeding the I/O Fund’s original expectations. Server CPU revenue is now expected to more than double in 2027, up from the previous outlook for 70%+ growth. Meanwhile, Data Center AI revenue (GPUs) is expected to significantly more than double.

SEMICONDUCTOR STOCKSNOV 13, 2026
Nvidia Says Capacity Is the Constraint: 3 Bottlenecks Holding Back the AI Buildout
AI STOCKS

Nvidia Says Capacity Is the Constraint: 3 Bottlenecks Holding Back the AI Buildout

Nvidia has signed capacity agreements with six key suppliers for chip parts and has a new design to build AI data centers, even as CEO Jensen Huang points out extraordinary demand amid capacity constraints. However, grid power remains the limit Nvidia can’t fix on its own.

AI STOCKSNOV 13, 2026
Data Centers in Space: Google Runs AI on 1 kW in Orbit as SpaceX Bets on Orbital Compute
DATA CENTER

Data Centers in Space: Google Runs AI on 1 kW in Orbit as SpaceX Bets on Orbital Compute

Google ran AI in orbit on about 1 kW. SpaceX plans 250 kW satellites. A 1 GW campus on Earth uses 1,000,000 kW. We take a deep dive into what it takes to put data centers in space.

DATA CENTERNOV 12, 2026